Saturday, November 8, 2014

The last piece

Here go the last pieces of drywall for the great room! Doesn't the room look great? Can you imagine what it will look like when the beams are finished? Monday they start the mudding and texturing of the drywall in the entire house. The log cabin is getting closer to being completed!!

Thursday, November 6, 2014

Half done

About half of the 20 foot ceiling in the great room is done. Here's proof to Wendy that professionals, not us, did it.
Won't the ceilings look great when we get the beams finished?

Wednesday, November 5, 2014

Especially for Wendy

Wendy has insisted that we not drywall the 20 foot ceilings ourselves. So today they delivered the 12 foot sheets of drywall for the professionals to do it for us. Grandma and I could only handle 8 foot sheets. We'll keep you posted on the progress.

Tuesday, November 4, 2014

Electricity at the house

We now have electricity at the edge of the house so we don't have to use 200 foot extension cords from our transformer. Here they are pulling the main line from the transformer to our meter box by the house. The house is already wired so once outlets, lights, etc. are attached to the wires, we can flip a switch and the house is ready to go.

Saturday, November 1, 2014

Circus comes to town

When we were in Hungary, we took all the primary kids in Sopron to the circus. They all had a great time. Grandma vowed that when we got home we'd do the same with our grandkids. Her memory is still strong, so when the circus came to town, we grabbed the closest grandkids and went. The highlight was joining the performers and riding the elephant.

10 down and done

We finished the last bit of drywalling that we planned to do. Here is a look at the mud room/washer room and the guest half bath. Notice the glass block window so there is light in this interior bathroom.
This next week the professionals arrive to drywall the 20 foot ceiling in the great room and tape, mud, and texture all the rooms. Things should move fast the next two weeks.

Saturday, October 25, 2014

Halloween Spook?

Is this a Halloween Spook from outer space hiding in our new place?
No, it's grandpa showing off the drywall in the pantry.
That counts as half a room. We just have the guest half bath to go to finish the 10 rooms that we are drywalling. These small rooms with all their angles and corners for the air conditioning, plumbing and electrical "chases" take longer to do than a large room. Next the professionals come in to do the 20 foot ceiling of the great room and mud and finish up all the drywall. This is the finish they will put on. I think it is called "knock down."
So we're getting closer to moving in.

Tuesday, October 14, 2014

9 down and 1 to go

We have almost finished all the drywalling. We just finished the master bath (we just need to hire a tile setter to finish the shower and tub)...
and the master walk-in closet (which will also be grandma's sewing room).
We are now finishing up the last room--the pantry and guest bathroom by the mud room. They are small so the two count as one room. Once we hire someone to do the ceiling of the great room, we'll be ready to start the finishing touches. The kitchen cabinets and counters have already arrived and are ready to install once we get the walls finished. We also have the floors ready to put down.

The electrician has been here the last couple of days putting in the control panels for the house,
the shed,
and the pump,
with space in the master panel outside for the future pool and guest house. Soon electricity can be brought into the house and we won't have to keep using 200 feet of extension cords when we need electricity in the house for the saws, electric fans, and lights after dark. Things are moving along. With luck, we'll be in the house in November.

Thursday, October 9, 2014

Eureka!!

Like Lehi of old, it came as a vision in the night what I should do to get drywall around pipes in the bathroom. (Did Lehi's visions have some help from YouTube?) The upstairs bath is now drywalled except for around the tub.
We are now ready to finish up the downstairs--though today we made a trip to Bubba'a Cracker Cypress Sawmill in Williston to get some advice on how to do the stairs once the great room has been drywalled. Here's a look at what we showed Bubba of our roughed in stairs and loft to help generate ideas. We have something really fun in mind.

Wednesday, October 8, 2014

8 down and 2 to go--almost

We finished 1 and 1/2 more rooms--the walk-in closet in the bunk room and the hall leading to the bunk room from the loft (together these count as a 1/2/ room--these small rooms actually take as long as a big room since there is so much cutting and measuring. Notice the "access to void by owner" from the building plans. You already saw the one void we used to create a Harry Potter sleeping place and the two we'll use for recessing filing cabinets in the library. This one will be for storing luggage and perhaps Christmas decorations)...
and before the sun set, we almost finished drywalling the upstairs bathroom. You can see me contemplating how I'm going to get the drywall around all these pipes. I'm sure I'll think of something in my sleep tonight. We'll let the tile setter figure out how to do the area around the bathtub. Remember too that we have something special planned for above and below the windows.
We are now done with the basic drywalling upstairs. Someone else will do the loft and great room (as we promised Wendy) and mud the drywall. We'll now finish up downstairs and get ready to paint and tile.