Today they put in the windows and finishing touches on the outside second floor. Just the frames around the windows remain and I pick up the boards for that tomorrow.
Inside they put up the framing for the bathroom and the bedroom on the south side of the loft. Tomorrow they will do the north bedroom and study and do some more work on the supports for the great room. If all that gets done, the dried in package will be complete and the electrician, plumber, and air conditioning guys can start their work. The roofers are set up to do their job with the metal roof tomorrow.
Here's another aerial view, this time from the back.
No comments:
Post a Comment