Tuesday, May 13, 2014

Day 16

The outside from the ground level looks the same as for day 15.
But today they put up the floor for the loft and the upstairs bedrooms. Here you can see them bringing the plywood through the dining room window and gluing down the wood before nailing it in so it won't squeak when people sleeping upstairs walk on it when they get up to go to the bathroom in the middle of the night.
You can see the support beam for the music room from the great room and from inside the music room.
Here's a look at the loft floor from the top and from underneath.
They have to work on another house tomorrow so it will be a couple of days before they finish the floor and start putting up the walls and the roof.

1 comment:

  1. So, with seminary abt done and a covered bedroom, you going to set up
    air mattress and start sleeping there until they resume?

    ReplyDelete